The Project: Refurbishment of a 900,000 sq. ft. Wilkinson’s warehouse and distribution centre. The refurbishment included necessary tanking works to several conveyor belt and lift pit areas.
Best Western, Aston Hall Hotel, Nr. Sheffield
Waterproofing
The Project: The construction of a detached, part retaining, new build function and events building for the Best Western Aston Hall Hotel near Sheffield.
St Aubyn’s Rise, Tiverton, Devon
Waterproofing
The Project: Development of 14 3 & 4 bedroom detached luxury homes set within the picturesque Exe Valley near Tiverton, Devon. The development site significantly slopes from front to rear resulting in several of the plots being built into the hillside.
B&B Barn Conversion, Usk, Monmouthshire
Waterproofing
The Project: Barn conversion to B&B accommodation. The earth retaining elements of this barn conversion required specialist waterproofing to protect the finishes from water ingress from the ground.
Former Stuart Crystal Factory, Stourbridge, West Midlands
Waterproofing
The Project: To restore & convert the former Stuart Crystal Factory in Wordsley, Stourbridge to provide a mix of commercial & residential space. Specialist waterproofing works required during the restoration.
Horizon Apartments, Ogmore-by-Sea, South Wales
Waterproofing
The Project: 7 award winning, luxury new build apartments complete […]
Hertford College, Oxford University
Waterproofing
The Project: To waterproof a wine cellar within the prestigious […]
The Hopbunker, Cardiff
Waterproofing
As part of the refurbishment of Northgate House in Cardiff City Centre, the basement level of the building was to be converted into a brand new bar for local independent brewery, Hopcraft.
Residential Care Home, Swansea – Podium Deck Waterproofing
Waterproofing
During the construction of a new, purpose built, residential care home in Swansea, two podium decks were constructed that needed waterproofing.
Llandegfedd Reservoir, Monmouthshire
Waterproofing
A new Visitor Centre at the popular Llandegfedd Reservoir was […]
Former Central Fire Station, Lancaster Circus, Birmingham
Waterproofing
Conversion of the Grade II listed former Central Fire Station […]
Lynmouth Pavillion, Exmoor
Waterproofing
Lynmouth’s new pavilion reopened in October 2013 following a £1.2 […]
Benfield Gymnastics, Newcastle
Waterproofing
The Benfield Centre for Sporting Excellence, Newcastle, boasts one of […]
Pizza East, Kentish Town, London
Waterproofing
To facilitate best use of space, the designers of a […]
The Florence Institute, Liverpool
Waterproofing
Constructed in 1889 the “Florrie” as it is know by […]
Pillar & Lucy, Gloucester
Waterproofing
The Project: A £400m development of the Gloucester Quays area including the refurbishment of Pillar & Lucy House, an 1834 brick built warehouse. Protectahome were asked to waterproof the canal side vaulted basements as part of the refurbishment.
St Pancras Station, London
Waterproofing
Protectahome are proud to be associated with the £800m regeneration […]
De Montfort University, Leicester
Waterproofing
A new Information Technology Centre being constructed within the basement […]
New Sports Hall, Tenbury Wells
Waterproofing
A new build project constructed into an earth bank to […]