New Case Study: Wilko Distribution Centre, Monmouthshire
The Project: Refurbishment of a 900,000 sq. ft. Wilkinson’s warehouse and distribution centre. The refurbishment included necessary tanking works to several conveyor belt and lift pit areas.
The Project: Refurbishment of a 900,000 sq. ft. Wilkinson’s warehouse and distribution centre. The refurbishment included necessary tanking works to several conveyor belt and lift pit areas.